2014年8月14日星期四

concrete mixer installation procedure

concrete mixer in place, the foundation must be solid, stand or feet creel solid, are not allowed to replace a tire support,concrete batching plant should be checked before opening mixer good clutch, controllers, wire rope and other properties, not a foreign body inside the drum.
concrete mixer hopper rises when any person is prohibited by or stay in the hopper, the hopper should be fixed after work, when mechanical operation, the tool inserted into the drum is strictly prohibited.
concrete mixer operation is prohibited without a license, unauthorized leave their jobs when the operation is prohibited.
When concrete mixer machinery maintenance,Concrete mixing plant
  should be fixed hopper, cut off the power, the outside into the drum when should someone care overhaul.
After the work should be finished cleaning machinery, cleaning machinery around, good lubrication and maintenance, cut off the power to lock the door.

没有评论:

发表评论